Construction Cost Index for collectively built one- or two-dwelling buildings
Wage drift and VAT excluded
Collectively built one- or two-dwelling buildings | 2024 | 2025 | |||||
---|---|---|---|---|---|---|---|
Type of costs | Jan | Aug | Sep | Oct | Nov | Dec | Jan |
Materials | 156.2 | 160.7 | 159.9 | 159.8 | 159.8 | 159.9 | 161.7 |
Labour, wage drift excluded | 119.6 | 123.5 | 123.5 | 123.5 | 123.5 | 123.5 | 123.6 |
Plant and equipment | 134.9 | 134.9 | 134.9 | 134.9 | 133.7 | 133.7 | 133.7 |
Transport, energy | 136.9 | 133.4 | 131.9 | 132.2 | 135.1 | 134.6 | 136.2 |
Contractor's other costs | 130.9 | 133.4 | 132.9 | 133.0 | 133.2 | 133.4 | 133.8 |
Contractor's costs (1–5) | 137.6 | 140.8 | 140.3 | 140.3 | 140.5 | 140.5 | 141.4 |
Clients other costs | 178.2 | 175.7 | 173.0 | 169.7 | 167.6 | 164.1 | 164.0 |
Total Construction cost index (1–6) | 145.5 | 147.6 | 146.7 | 146.0 | 145.8 | 145.1 | 145.8 |