Construction Cost Index for collectively built one- or two-dwelling buildings
Wage drift and VAT excluded
Collectively built one- or two-dwelling buildings | 2023 | 2024 | ||||||
---|---|---|---|---|---|---|---|---|
Type of costs | Sep | May | Jun | Jul | Aug | Sep | Oct | |
Materials | 155.8 | 159.1 | 159.8 | 159.9 | 160.7 | 159.9 | 159.8 | |
Labour, wage drift excluded | 119.5 | 123.5 | 123.5 | 123.5 | 123.5 | 123.5 | 123.5 | |
Plant and equipment | 134.0 | 135.0 | 135.0 | 135.0 | 134.9 | 134.9 | 134.9 | |
Transport, energy | 145.8 | 135.2 | 135.0 | 134.8 | 133.4 | 131.9 | 132.2 | |
Contractor's other costs | 129.2 | 133.1 | 133.2 | 133.2 | 133.4 | 132.9 | 133.0 | |
Contractor's costs (1–5) | 137.7 | 140.3 | 140.5 | 140.6 | 140.8 | 140.3 | 140.3 | |
Clients other costs | 176.8 | 180.0 | 179.2 | 178.2 | 175.7 | 173.0 | 169.7 | |
Total Construction cost index (1–6) | 145.2 | 148.0 | 148.0 | 147.9 | 147.6 | 146.7 | 146.0 |